4. Wiring

4.1. Wiring Precautions

When performing wiring operations, the following requirements should be strictly followed:

Note

../_images/003.png

Name:Warning

Explanation:

  • Do not touch the internal joint module components of the arm base to avoid the risk of electric shock.

  • External wiring work must be performed only by qualified engineers who have been trained and authorized.

  • Before powering on, it is necessary to check the voltage level of the equipment, otherwise it may cause casualties and equipment damage.

  • To ensure safety, the equipment must be reliably grounded.

  • Except for the power connector, it is strictly forbidden to connect the power input end to any other terminals, otherwise, the product may be damaged.

  • All terminal input voltages must not exceed the allowed range.

  • Before power is applied, it must be ensured that the wiring sequence is correct, the connections are secure, and the insulation is reliable; otherwise, the product may be damaged.

4.2. System wiring

The humanoid robotic arm ART14-R7 has four configurations: Configuration one is a single arm, configuration two is a single arm + controller, configuration three is dual arms, and configuration four is dual arms + controller + distributor. Its wiring diagrams are shown in 4-1, 4-2, 4-3, and 4-4.

The humanoid robotic arm ART14-R7’s power supply voltage is DC48V, and the power supply voltage for the controller and brancher is DC24V, as shown in4-5and4-6.

031.png

Chart 4-1 Configuration One Wiring Diagram

032.png

Chart 4-2 Configuration Two Wiring Diagram

033.png

Chart 4-3 Configuration Three-line Diagram

034.png

Chart 4-4 Configuration Four Wiring Diagram

035.png

Chart 4-5 Controller wiring position

036.png

Chart 3-6 Branch wiring location

4.3. Upper computer debugging wiring

Use an Ethernet cable to connect the host computer and the controller when debugging the robotic arm. As shown in 4-7.

037.png

Chart 4-7 Upper Computer and Controller Wiring Diagram

Note

../_images/001.png

Name:Notice

Explanation:

  • 24V、48V please prepare your own power supply.

  • Please prepare your own Ethernet cable for the upper computer debugging.

  • Please prepare the network cable between the controller and the splitter by yourself.